Installation of filling station at South Gaza Desalination Plant
-
CategoryEmergency
-
Clientمنظمة الأمم المتحدة للطفولة - يونيسف
-
Supervisorاليونيسف
-
Funded By-
-
RegionSouthern Governorate
-
From - To2024-12-25 - 2025-05-30
-
Value36,363.00$
Installation of a booster pump with capacity of 60m3/hr at 20 m head f
- Installation of three overhead truck filling points using reinforced 4" filling hoses connected to 3” HDPE filling bars.
- Laying of all piping works between pumps and filling points, including 160mm, 110mm, HDPE pipes (PN16).
- Supply and installation of painted mild 4 steel structures for the filling units