Gaza Central Wastewater Project - Reconstruction ProgrammeER6-2 Reconstruction of Water Network
-
CategoryWATER / WASTEWATER NETWORKS
-
ClientCMWU
-
SupervisorDORSCH INTERNATIONAL CONSULTANTS GMBH
-
Funded ByKFW
-
RegionWastewater
-
From - To2015-06-15 - 2017-01-18
-
Value781,895.00$
Supply and installation of about 22,000 LM UPVC pipes of different diameters (110mm. 225mm, 315mm), and 4,000 LM M.D.P.E with all needed fittings, valves (up to 16"), manholes.