Gaza Central Wastewater Project- Reconstruction Programme ER6-3 Reconfiguration of internal Water Network.
-
CategoryWATER / WASTEWATER NETWORKS
-
ClientCMWU
-
SupervisorDORSCH INTERNATIONAL CONSULTANTS GMBH
-
Funded ByKFW
-
RegionWastewater
-
From - To2015-08-15 00:00:00 - 2017-01-04 00:00:00
-
Value436,581.00$
Supply, installation and commissioning of about 7,000 LM UPVC pipes, PN (12.5) of different diameter (110mm,160mm, 225mm, 315mm, 450mm) with all needed fitting, valves (up to 12"), manholes.
Asphalt Pavement: 6,000m2