GCWWT Project- Reconstruction Program (Er6-2/Er6-3) Water Networks

  • Category
    WATER / WASTEWATER NETWORKS
  • Client
    CMWU
  • Supervisor
    DORSCH INTERNATIONAL CONSULTANTS GMBH
  • Funded By
    KFW
  • Region
    Bureij
  • From - To
    2015-01-01 00:00:00 - 2016-01-01 00:00:00
  • Value
    1,100,000.00$

The project aims to improve water accessibility to serval district in GAZA City through providing better controlling operation and mainte­nance for main feeders and control valves, also it aims at configura­tion of the supply and distribution network by introducing 40 new main control valves and implement 20 major new connection a long main wells and carrier.

The project scope covers laying of about 40 KM water UPVC pipe line with required survey, earth work, concrete work, asphalt, interlock, re­instatement, manholes and connection details, the work include all re­quired material and equipment needed.