Upgrading And Maintenance Of Beit Hanoun Pump Stations

  • Category
    PUMPING STATIONS, SCADA, PLC
  • Client
    CMWU
  • Supervisor
    CMWU
  • Funded By
    WORLD BANK
  • Region
    Beit Hanoun
  • From - To
    2011-06-01 00:00:00 - 2012-04-01 00:00:00
  • Value
    722,187.00$

The project scope of works covered excavation, leveling, trenching and backfilling works including the necessary clearing, grubbing and preparation of the site, removal and disposal all debris; excavation and trenching as required; all necessary sheeting, shoring and protec­tion work; preparation of sub grades; pumping and dewatering as nec­essary or required and supply of related mechanical equipment such .as bar screens, pumps, manifold, Air release valves

The object of the contract is to permit all that is necessary for upgrad­ing of PS 1, PS2, PS3