Key facts
- Pipe length
- About 65 km
- Diameters
- DN150–DN1600
- Pipe material
- Ductile iron
- Locations
- Rafah and Khan Younis governorates
Contract W01 (PWA/WB/2021/063-CTD) of the World Bank–funded Gaza Central Desalination Plant and Associated Works, Phase 1, for the Palestinian Water Authority. The works reconfigure the water distribution systems of the Rafah and Khan Younis governorates so that desalinated water from the planned central plant can be distributed across their municipalities. MACC is executing the works; they were paused by the war in October 2023.
Scope of work
- Supply and installation of about 65 km of ductile-iron water pipelines from DN150 to DN1600
- Connections to the existing water networks, with valve chambers
- Reservoir upgrades, including the Tal Al Sultan reservoir
- Works in the Rafah, Al Shoka, Al Naser and Al Fukhari municipalities (Rafah governorate)
- Works in the Khan Younis, Al Qarara, Bani Suhaila, Eastern Villages and Wadi Al Salqa municipalities (Khan Younis governorate)
- Environmental and social management of the works under World Bank requirements